JapanDesk

Practical guides for selling to Japan — written by someone who does the paperwork.

Turn a vague client brief into quoteable deliverables

Define quantities, client inputs, review rounds and exclusions before quoting a Japanese client. Includes a worked brochure scope and bilingual confirmation.

Published October 30, 2026 · Updated October 30, 2026 · Checked against 2 primary sources · Drafted and checked by our engine

What happened

You work outside Japan and a Japanese company asks you to “prepare an English version of our sales brochure.” Nobody has said whether you are translating, rewriting or laying out supplied English copy.

Consider a fictional Singapore-based designer quoting to a Japanese manufacturer. The proposed output is a twelve-page English brochure, delivered as a PDF and an editable design file; translation would come from the client. The buyer is also considering four extra pages, but has not selected them.

This example’s quantities and arrangements are invented, not market rates or a Japanese standard. Prepare a scope block showing your outputs, the buyer’s inputs and what prevents a firm proposal.

What’s going on on the Japanese side

Name the deliverable instead of quoting an undefined service

JETRO provides English business correspondence for exporters from Japan, including a covering email that describes a quotation’s pricing, terms and specifications. That is a document example, not a rule for an overseas provider selling into Japan. Source

Takeda asks suppliers to report purchase-order discrepancies in price, quantity, delivery time and unit of measure to their contact. Those are Takeda’s instructions, not a shared Japanese purchasing policy. Source

In this worked example, define a page as one finished PDF page, including the front and back covers. Twelve source pages do not necessarily become twelve English pages; confirm the finished count against the proposed layout before treating it as fixed.

Scope fieldProposed brochure definitionWhat the buyer must confirm
Purpose and audienceEnglish product overview for prospective distributorsIntended readers and content priorities
Finished quantityTwelve PDF pages, including both coversApproved page map and content that fits it
Designer’s workLayout of supplied English copy and approved imagesWhether new diagrams or image editing are also needed
OutputsPDF plus editable design filePage dimensions, PDF use, design application and version
Content baselineNamed English copy version and asset listWhich files are final enough to price against

Do not leave “editable file” as the entire handover specification. Identify the application/version, included linked assets and any items the recipient must license separately. File delivery and permission to use third-party materials are different questions; do not promise ownership of everything inside the file.

Separate client inputs from work you will supply

The phrase “English version” describes an output language, not who translates the text. Ask whether the client will supply final English copy or wants translation priced separately. If the answer is unknown, label it as unresolved rather than quietly excluding translation in a footnote.

This responsibility map proposes arrangements, not legal duties.

Input or taskProposed ownerEvidence needed before fixing the scope
English text and technical terminologyClientApproved copy file, version and content reviewer
Translation from JapaneseClient’s chosen translatorConfirmation that translation is outside the designer’s base work
Logo, images and permission to supply themClientAsset list and any restrictions relevant to delivery
Layout and PDF productionDesignerConfirmed page map and output specification
Copy rewriting and new illustrationsNot included in base proposalSeparate description and price if requested

Keep confidential files in the agreed private location. Record references and responsibility here; a filename alone does not establish approval.

What to do next

Define one review round through a visible input and response

  1. Propose a review unit before adding an allowance. For this example, propose two rounds, each consisting of one consolidated annotated PDF from the buyer’s nominated coordinator and a revised PDF responding to that list. Ask the buyer to confirm the unit, who consolidates conflicting comments and what marks completion of a round.

Separate corrections against the agreed input from changed preferences and new content. State how errors and later comments will be handled; do not describe every email as a new round or treat your own production error as an automatic paid addition. Two rounds are a negotiable term in this example, not a default entitlement.

  1. Make the completion check observable. Propose checking page count, presence of approved copy and images, PDF readability, editable-file opening requirements and resolution of the agreed review list. Ask who will check each item and how they will report the result. A stated goal such as “more persuasive” needs concrete content or layout criteria before it can serve as a completion test.

For feedback on accepted work, use the separate guide to included revisions and new requests rather than rewriting the accepted allowance retrospectively.

Put exclusions and optional work beside the base scope

  1. Show what is being priced and what is not selected. Keep the proposed twelve-page base separate from the possible four-page addition. If the addition is agreed, the finished count becomes sixteen pages; that arithmetic does not determine the extra design effort or establish an agreed per-page rate.
ItemScope statusTreatment in the proposal
Twelve-page layout, PDF and specified editable fileProposed basePrice after confirming inputs and output specification
Four additional pagesOptional, not selectedSeparate scope and price; exclude from the base total
English translation and copy rewritingOutside proposed baseAsk whether the buyer wants a separate quotation
Print procurement and physical deliveryOutside proposed baseDo not imply that a PDF delivery includes printed brochures
Rights or licences beyond those specifiedUnresolved where relevantClarify before promising the affected handover or use

Check whether the PDF is for screen use or print production. If the buyer needs a printer-ready file, obtain that printer’s requirements before committing to it. Do not treat printing as an included task because the project happens to be called a brochure.

Choose a fixed scope, an explicit assumption or a clarification step

  1. Choose the next step according to the unanswered question.
Current evidencePractical next stepWhat remains unconfirmed
Finished quantity, input versions and output requirements are confirmedPrepare the defined scope for pricingCommercial terms and authorization to proceed
Purpose is clear but finished page count is provisionalState the provisional count and how it will be confirmed before a firm offerFinal quantity and any resulting price or schedule change
Translation or rewriting responsibility is unknownAsk the buyer to choose who supplies that workWhether the base proposal can exclude it
Audience, content or success criteria are not settledPropose a bounded clarification stage, if usefulIts own deliverable, price and approval, separate from production

A clarification stage might produce an agreed page map and missing-input list. Obtain agreement before starting a paid stage; a quote request is not an instruction to perform extra work. Do not present the finished brochure as a fixed-price commitment while its essential scope remains unresolved.

Send a scope block the project owner can confirm

  1. Return a brief decision request with the proposed scope attached. Identify the proposal version, the fields ready for confirmation and the specific unanswered question. Ask the existing contact who can confirm content and who handles purchasing; a helpful reply from one person does not establish every approval needed to start.

Before sending, check that the scope shows:

  • The finished deliverable, unit and quantity, with covers and optional pages treated consistently.
  • The exact input responsibility, file version and output format.
  • The proposed review unit, coordinator and completion checks.
  • Exclusions, unselected options and unresolved rights or licence questions.
  • The next decision, its owner and any schedule dependency.

Use the full quotation checklist for price, currency, payment terms and document references after the scope is clear. If an earlier unaccepted quotation needs changing, preserve its version and use the quotation revision record.

Template

Confirm the translation responsibility before pricing the base scope

Adapt this single bilingual request to the actual proposal. Both versions ask for clarification, not authorization to start work.

Subject: Scope confirmation before the brochure quotation

The proposed base scope is a twelve-page English brochure, including
both covers, delivered as a PDF and the specified editable design file.
It assumes your team supplies final English copy and approved assets.
Translation, copy rewriting and print ordering are outside this base.
The possible four extra pages are optional and not yet selected.

Will your team supply the final English copy, or should translation
be quoted separately? Please also identify who can confirm the page
map, output requirements and proposed consolidated review process.
I will use those answers to prepare the quotation; this message does
not request authorization to start production.

件名:パンフレットの見積作成前の業務範囲確認

基本案は、表紙・裏表紙を含む全12ページの英語パンフレットを、
PDFと仕様を確認した編集可能なデザインデータで納品する内容です。
確定した英文原稿と使用可能な素材を貴社からご支給いただく前提で、
翻訳、英文の書き直し、印刷発注は基本案に含みません。
追加4ページはオプションで、まだ選択されていません。

確定英文原稿は貴社でご用意いただけますか。それとも翻訳を別途
見積もる必要がありますか。ページ構成、納品仕様、ご意見を取り
まとめる確認手順について、回答いただける担当者もお知らせください。
回答をもとに見積書を作成します。本メールは制作開始の承認を
お願いするものではありません。

When to bring in a professional

Escalate rights and disputed obligations rather than guessing from file formats

You can describe outputs, inputs and open questions with the project contact. Ask a qualified legal adviser about disputed scope, intellectual-property ownership, licence restrictions or contract terms. A translator or subject specialist can check whether supplied English copy conveys the intended technical content; the designer’s layout review does not establish that accuracy.

Kit

Put one unresolved scope question into your next quotation

Use the tables in your existing document, or open the free First-Quote Starter as a starting point. No paid kit is needed for this exercise. Transfer one unresolved input or output question, obtain the buyer’s answer, and then update the scope; the overall selling workflow places that step before ordering, delivery and invoicing.

This guide goes stale when

  • JETRO changes its quotation correspondence or document examples.
  • Takeda changes its published purchase-order review instructions.
  • The proposed deliverables, input responsibilities or review arrangements change.

When one of these happens, the guide goes back into the queue for a re-check against the sources below.

Sources

Publisher Document Checked
jetro JETRO overseas business support October 30, 2026
other Takeda Third-Party Tools and Resources — Purchase Order Review October 30, 2026

This guide summarizes publicly available information from the sources listed above. It is not tax, legal, or immigration advice. A tax accountant (税理士, zeirishi) or a lawyer licensed in Japan can tell you how it applies to your case.

Was this useful?

More on Selling B2B

Get the next guide by email

Two emails a month: new guides, and what changed on the Japanese side. Unsubscribe in one click.

On this page